Centro de Recursos de PP&M

Encuentre recursos disponibles al seleccionar de las categorías de abajo.

  • Industrias
  • Software Empresarial
  • O/O
  • Tipo Recurso
  • Productos
  • Buscar

Conozca cómo Intergraph responde ante sus necesidades específicas de industria.


El Software empresarial cumple sus retos del mundo-real.


Soporte sus flujos de trabajo de EPC u O/O con componentes empresariales.


Seleccione el tipo de recurso que desea ver.


Busque palabras específicas o frases, tipos de documentos, productos, industrias, software, dueños/operadores o identificador de activos.



Found 11 results in Resource Types - Case Study

Case Study - Owner Operators Spotlight – A Special Focus Edition of Insight Magazine

Learn how Intergraph offers real value for owner operators, including Neste Oil, Nynas, PTTEP, SCG Chemical Group, Suncor, and Vietsovpetro.
View Online Resource

Case Study - Marine Industry Spotlight – A Special Focus Edition of Insight

Includes case studies on Keppel Offshore & Marine, Grenland Group, Samsung Heavy Industries, Martec Ltd., and Vietsovpetro. Class Society Perspectives from Lloyd's Register, DNV, and ABS are shared. A SNAME Industry Perspective is followed by Did You Know? Intergraph SmartMarine Enterprise.
View Online Resource

Case Study - SmartPlant Spoolgen Helps Heerema Construct in Record Time

SmartPlant Spoolgen is now integral to Heerema’s fabrication business. The product is used in all of the company’s construction projects for the production of drawing shop isometrics and spools.
Download - 217 KB

Case Study - Corrigan Company Fabricates 11,000 Feet of Pipe for Brewery with SmartPlant Spoolgen

In 2005, Corrigan won a contract to assist with the construction of a new brewery in St. Louis for Anheuser Busch, one of the largest beverage producers in the world. SmartPlant Spoolgen was used to fabricate more than 11,000 feet of above-ground and underground piping for carbon dioxide transfer and utility pipe at Anheuser Busch’s St. Louis facility.
Download - 112 KB

Case Study - Rosetti Marino Saves Time and Money by Automating Isometric Production

Rosetti Marino won a contract with Agip, an Italian automotive gasoline and diesel retailer. Rosetti Marino decided there must be a better method of producing spool drawings for the workshop. One of Italy’s leading software resellers suggested that Rosetti Marino try SmartPlant Spoolgen.
Download - 102 KB

Case Study - Case Study: IBERDROLA Engineering and Construction, Spain

IBERDROLA Engineering and Construction reduces design times with Intergraph software. IBERDROLA chose SmartPlant Enterprise to complete power projects.
Download - 116 KB

Case Study - SmartPlant 3D Spotlight – A Special Focus Edition of Insight

Discover how Intergraph’s next-generation, data-centric, rule-driven plant design software, SmartPlant 3D, is benefiting companies worldwide, including Suncor, De Smet, Chematur, and others.
View Online Resource

Case Study - Case Study: Cryostar SAS, France

Cryostar selected Intergraph SmartPlant Enterprise solutions to lower deliverable costs. Cryostar implemented Intergraph’s SmartPlant 3D, SmartPlant P&ID, SmartPlant Review, SmartPlant Foundation, and SmartPlant Instrumentation solutions to ensure the quality and accuracy of the information transmitted by the 3D models and other deliverables it submits to customers.
Download - 120 KB

Case Study - Case Study: Siemens Energy Sector, Germany

Siemens Energy Sector sets new records in profit and revenue with SmartPlant 3D. Intergraph technology offers streamlined solutions and reduces project hours.
Download - 108 KB

Case Study - Case Study: GlaxoSmithKline Cork, Ireland

Irish pharmaceutical company employs SmartPlant Enterprise to reduce design and operating costs. GSK Cork discovers significant time savings by harnessing the power of intelligent data.
Download - 166 KB

Case Study - Case Study: Samsung Heavy Industries

Samsung Heavy Industries, Korea, reaches new levels of productivity. Intergraph SmartMarine 3D increases safety and quality on an accelerated schedule.
Download - 492 KB